• Facilitate the development and documentation of the procedures and work process flows.
  • The suite of documents includes
    • Quality Management Procedure.
    • Procurement procedure for Shop Drawing and DATA Preparation Management.
    • Project Control Procedure.
    • Material and Logistics Management Procedure.
    • Bar Code Procedure

Commercial Requirement

  • The IPD methodology┬áneeds to be included in the head contract between the Client and EPC and / or the subcontract agreements between the EPC and all vendors.
  • The development, implementation and integration of the documented IPD procedures into the Contract Document is a compulsory requirement.
  • A contract including the IPD method is binding on all contracted proponents.
  • All parties that have signed the contract are obligated to execute the project in accordance with the conditions of the contract.
  • The IPD procedures and work flows included in an executed contract will enable the project hierarchy the commercial and technical ability to implement IPD systems throughout the project team and vendor supply chains.