• Engage with the project director/ manager to identify and categorise the primary activities that require monitoring, tracking and measurement.
  • The establishment of categories and tracking attributes for each element of the WBS may include activities listed below.

Design

  • Design Drawings IFA.
  • Design Drawings IFC.

Shop Detail Drawings

  • Shop Drawings IFA
  • Shop Drawings IFC

SMP Manufacture

  • Material in Store
  • Fabrication and Welding Completed.
  • Painting Completed
  • Final Assembly Completed
  • Transport Completed.

Site Logistics

  • Received in site lay down area.

Site Erection

  • Erected into final position

 